Water Levels and Discharges
2014-11: BMBF-Project NAWAK: Development of sustainable Adaption Strategies
2008-17: Measurement of Discharges for Floods at Rivers Wulbeck and Wietze
Currrent Velocities
Echo Soundings
2007-02: Two-Frequency Echo Sounding of the Lake „Steinhuder Meer“
2014-02: Monitoring and preservation of evidence for four excavated lakes
Rainfall-Runoff-Relation
2012-09: Setup and Operation of Gauges, Measurement and Calculation of Discharges at „Grasgehege”
Statistics using WISKI
2012-01: and Operation of 2 Gauges at Deelschlot (Framework Contract).
2011-10: Setup, Operation and Statistical Analysis of 3 Gages – WW Burgdorfer Holz (Framework Contract)
Projects
2017
2017-28: Setup and Operation of groundwater auf surface water gauges for a monitoring system in the area of Wittlage (Framework Contract). Wasserverband Wittlage.
2017-26: Determination of the scientific background of the available water resources for the Water law procedure procedure for the Water Works Graft, Delmenhorst (Framework Contract). Stadtwerke Delmenhorst GmbH.
2017-25: Sounding of the excavated lakes Hastrasee / Langenhagen, Wegeleben and Ringelheim. Hermann Wegener GmbH & Co. KG.
2017-23: Setup and Operation of groundwater gauges for a monitoring system in the area of the Vinnhorster Graben (Framework Contract). Gerald Baumgarte.
2017-22: Setup of Gauges at Ahlhorner Lakes (Water Works „Großenkneten“). Oldenburgisch Ostfriesischer Wasserverband.
2017-20: Setup and Operation of Gauges, Discharge Measurements and hydrological Analysis at the Creek „Große Süderbäke“ to calculate Infiltration/Exfiltration to the Aquifer System of the Water Works „Westerstede“ (Framework Contract). Oldenburgisch Ostfriesischer Wasserverband.
2017-19: Water law procedure „Fuhrberger Feld“: Longterm Simulation of Water Levels and Discharges for the River System of the “Fuhse-Wietze-Wulbeck-Basin” in a coupled Groundwater-Surface-Water Model (Framework Contract). Stadtwerke Hannover AG.
2017-18: Setup and Operation of a Gauge, Discharge Measurements and hydrological Analysis at the Billerbach, the Pisserbach and the Beeke (Framework Contract). UHV Obere Fuhse.
2017-17: Operation of Gauges, Discharges Measurements, hydrological and statistical Analysis and Calculation of Infiltration/Exfiltration for Groundwater Aquifer “Fuhse/Wietze” (Framework Contract). Stadtwerke Hannover AG.
2017-16: Operation of Gauges, Discharge Measurements, hydrological and statistical Analysis for the Aquifer System of the Water Works “Annenheide” (Framework Contract). Stadtwerke Delmenhorst.
2017-15: Operation of Gauges and hydrological Analysis at the Rivers „Wulbeck“ and „Wietze“ (Framework Contract). Unterhaltungsverband Nr. 46 „Wietze“.
2017-14: Operation of Gauges, Discharge Measurements and hydrological Analysis for the Water Works „Ahlhorn /Denghauser Mühlbach“ (Framework Contract). Agrarfrost GmbH & Co. KG.
2017-13: Operation of Gauges, Discharge Measurements and hydrological Analysis for the River „Hengstbeeke” (Framework Contract). City of Burgwedel.
2017-12: Echo Sounding Mining Pit „Immensen“ (Framework Contract). Gustav Lehmann Mörtel-, Sand- und Kieswerke GmbH.
2017-11: Monitoring Wietzen/Holte: Setup and Operation of Gauges and Measurement of Discharges (Framework Contract). Nienburger Geflügelspezialitäten, Zentral Office Oldenburger Geflügelspezialitäten GmbH & Co. KG (Wiesenhof).
2017-10: Operation of Gauges, Discharge Measurements, hydrological Analysis and Calculation of Infiltration/Exfiltration in Rivers for the Water Works „Burgdorfer Holz“ (Framework Contract). Wasserverband Peine.
2017-09: Operation of Gauges, Discharge Measurements and hydrological Analysis for several Creeks to calculate Water Balances for the Aquifer System of the Water Works “Holdorf” (Framework Contract). Oldenburgisch Ostfriesischer Wasserverband.
2017-08: Monitoring the Industrial Area „Große Schneede“: Operation of Gauges, Discharge Measurements and hydrological Analysis at „Ochsenmoorgraben“ (Framework Contract). Stadt Walsrode.
2017-07: Operation of Gauges, Discharge Measurements, Monitoring of Conductivity and Calculation of Infiltration/Exfiltration to Rivers and Creeks of the Coastal Aquifer System of the Water Works „Sandeler Möns“ (Framework Contract). Oldenburgisch Ostfriesischer Wasserverband.
2017-06: Monitoring of Water Levels; Measurement of Discharges, hydrological Analysis and Calculation of Infiltration/Exfiltration to the Aquifer System of the Water Works “Thülsfelde” (Framework Contract). Oldenburgisch Ostfriesischer Wasserverband and WV Hümmling.
2017-05: Operation of Gauges, Discharge Measurements and Calculation of Exfiltration/Infiltrations to Rivers in the Catchment of the Water Works „Düshorner Heide“ (Framework Contract). Wasserversorgungsverband Landkreis Fallingbostel.
2017-04: Monitoring of several Mining Pits at Steinwedel, Aligse and Röddensen (Framework Contract). ENGE Kies- und Recycling GmbH & Co. KG.
2017-03: Operation of Gauges, Discharge Measurements and hydrological Analysis at Creek „Ahlder Bach“ near Water Works „Ahlde” (Framework Contract). Trink- und Abwasserverband Bad Bentheim, Schüttdorf, Salzbergen, Emsbüren.
2017-02: Operation of Gauges, Discharge Measurements and Calculation of Water Balances for the Compensation Pools „Krickmeere/Forest Upjever“ near Schortens, „Wildenkiel/Forest Hochsolling“ near Neuhaus and „Grasgehege“ near Radbruch/Lüneburg“, Kleine Igelriede” near Barrage Thülsfelde and “Ahlhorner Lakes” near Ahlhorn (Framework Contract). Niedersächsische Landesforsten.
2017-01: Monitoring of Groundwater Levels; Water Quality and Echo Sounding of Mining Pits „Engensen”, “Kohlshorn”, “Ramlingen” and “Wackerwinkel” (Framework Contract). Löffler Sand- und Kieswerke GmbH.
2016
2016-34: Setup and Operation of groundwater auf surface water gauges for a monitoring system in the area of Wittlage (Framework Contract). Wasserverband Wittlage.
2016-33: Flood risk mitigation and water quality of gauges in Hannover. Stadtentwässerung Hannover.
2016-31: Determination of the scientific background of the available water resources for the Water law procedure procedure for the Water Works Graft, Delmenhorst (Framework Contract). Stadtwerke Delmenhorst GmbH.
2016-29: Sounding of the excavated lakes Hastrasee / Langenhagen, Wegeleben and Ringelheim. Hermann Wegener GmbH & Co. KG.
2016-27: Measurement of a groundwater gauges for the Waterworks “Munster-Bispingen”. Stadtwerke Munster-Bispingen GmbH.
2016-25: Setup and Operation of groundwater gauges for a monitoring system in the area of the Vinnhorster Graben (Framework Contract). Gerald Baumgarte.
2016-23: Setup of Gauges at Ahlhorner Lakes (Water Works „Großenkneten“). Oldenburgisch Ostfriesischer Wasserverband.
2016-21: Setup and Operation of Gauges, Discharge Measurements and hydrological Analysis at the Creek „Große Süderbäke“ to calculate Infiltration/Exfiltration to the Aquifer System of the Water Works „Westerstede“ (Framework Contract). Oldenburgisch Ostfriesischer Wasserverband.
2016-20: Water law procedure „Fuhrberger Feld“: Longterm Simulation of Water Levels and Discharges for the River System of the “Fuhse-Wietze-Wulbeck-Basin” in a coupled Groundwater-Surface-Water Model (Framework Contract). Stadtwerke Hannover AG.
2016-19: Setup and Operation of a Gauge, Discharge Measurements and hydrological Analysis at Billerbach (Framework Contract). UHV Obere Fuhse.
2016-18: Operation of Gauges, Discharges Measurements, hydrological and statistical Analysis and Calculation of Infiltration/Exfiltration for Groundwater Aquifer “Fuhse/Wietze” (Framework Contract). Stadtwerke Hannover AG.
2016-17: Operation of Gauges, Discharge Measurements, hydrological and statistical Analysis for the Aquifer System of the Water Works “Annenheide” (Framework Contract). Stadtwerke Delmenhorst.
2016-16: Operation of Gauges and hydrological Analysis at the Rivers „Wulbeck“ and „Wietze“ (Framework Contract). Unterhaltungsverband Nr. 46 „Wietze“.
2016-15: Operation of Gauges, Discharge Measurements and hydrological Analysis for the Water Works „Ahlhorn /Denghauser Mühlbach“ (Framework Contract). Agrarfrost GmbH & Co. KG.
2016-14: Operation of Gauges, Discharge Measurements and hydrological Analysis for the River „Hengstbeeke” (Framework Contract). City of Burgwedel.
2016-13: Echo Sounding Mining Pit „Immensen“ (Framework Contract). Gustav Lehmann Mörtel-, Sand- und Kieswerke GmbH.
2016-12: Monitoring Wietzen/Holte: Setup and Operation of Gauges and Measurement of Discharges (Framework Contract). Nienburger Geflügelspezialitäten, Zentral Office Oldenburger Geflügelspezialitäten GmbH & Co. KG (Wiesenhof).
2016-11: Operation of Gauges, Discharge Measurements, hydrological Analysis and Calculation of Infiltration/Exfiltration in Rivers for the Water Works „Burgdorfer Holz“ (Framework Contract). Wasserverband Peine.
2016-10: Operation of Gauges, Discharge Measurements and hydrological Analysis for several Creeks to calculate Water Balances for the Aquifer System of the Water Works “Holdorf” (Framework Contract). Oldenburgisch Ostfriesischer Wasserverband.
2016-09: Monitoring the Industrial Area „Große Schneede“: Operation of Gauges, Discharge Measurements and hydrological Analysis at „Ochsenmoorgraben“ (Framework Contract). Stadt Walsrode.
2016-08: Operation of Gauges, Discharge Measurements, Monitoring of Conductivity and Calculation of Infiltration/Exfiltration to Rivers and Creeks of the Coastal Aquifer System of the Water Works „Sandeler Möns“ (Framework Contract). Oldenburgisch Ostfriesischer Wasserverband.
2016-07: Monitoring of Water Levels; Measurement of Discharges, hydrological Analysis and Calculation of Infiltration/Exfiltration to the Aquifer System of the Water Works “Thülsfelde” (Framework Contract). Oldenburgisch Ostfriesischer Wasserverband and WV Hümmling.
2016-06: Operation of Gauges, Discharge Measurements and Calculation of Exfiltration/Infiltrations to Rivers in the Catchment of the Water Works „Düshorner Heide“ (Framework Contract). Wasserversorgungsverband Landkreis Fallingbostel.
2016-05: Monitoring of several Mining Pits at Steinwedel, Aligse and Röddensen (Framework Contract). ENGE Kies- und Recycling GmbH & Co. KG.
2016-04: Operation of Gauges, Discharge Measurements and hydrological Analysis at Creek „Ahlder Bach“ near Water Works „Ahlde” (Framework Contract). Trink- und Abwasserverband Bad Bentheim, Schüttdorf, Salzbergen, Emsbüren.
2016-03: Operation of Gauges, Discharge Measurements and Calculation of Water Balances for the Compensation Pools „Krickmeere/Forest Upjever“ near Schortens, „Wildenkiel/Forest Hochsolling“ near Neuhaus and „Grasgehege“ near Radbruch/Lüneburg“, Kleine Igelriede” near Barrage Thülsfelde and “Ahlhorner Lakes” near Ahlhorn (Framework Contract). Niedersächsische Landesforsten.
2016-02: Monitoring of Groundwater Levels; Water Quality and Echo Sounding of Mining Pits „Engensen”, “Kohlshorn”, “Ramlingen” and “Wackerwinkel” (Framework Contract). Löffler Sand- und Kieswerke GmbH.
2016-01: Long term Monitoring of Water Levels at “Trunnenmoor” (Swamp) (Framework Contract). National Fond for Nature (NABU) – Office Burgwedel.
2015
2015-27: Echo Sounding, Measurement of Water Levels, ADCP Current Measurements and Setup a Water Balance for the Barrage „Lac de la Haute Sure“. Syndicat des Eaux du Barrage d’Esch sur Sure, Luxemburg.
2015-26: Setup and Operation of Gauges, Discharge Measurements and hydrological Analysis at the Creek „Große Süderbäke“ to calculate Infiltration/Exfiltration to the Aquifer System of the Water Works „Westerstede“ (Framework Contract). Oldenburgisch Ostfriesischer Wasserverband.
2015-25: Water law procedure „Fuhrberger Feld“: Longterm Simulation of Water Levels and Discharges for the River System of the “Fuhse-Wietze-Wulbeck-Basin” in a coupled Groundwater-Surface-Water Model (Framework Contract). Stadtwerke Hannover AG.
2015-24: Water law procedure „Burgdorfer Holz“: Additional hydrological Investigations for the River „Seebeeke“ to optimize Groundwater Management and available Water Resources. Wasserverband Peine.
2015-23: Setup and Operation of a Gauge, Discharge Measurements and hydrological Analysis at Billerbach (Framework Contract). UHV Obere Fuhse.
2015-22: Operation of Gauges, Discharges Measurements, hydrological and statistical Analysis and Calculation of Infiltration/Exfiltration for Groundwater Aquifer “Fuhse/Wietze” (Framework Contract). Stadtwerke Hannover AG.
2015-21: Operation of Gauges, Discharge Measurements, hydrological and statistical Analysis for the Aquifer System of the Water Works “Annenheide” (Framework Contract). Stadtwerke Delmenhorst.
2015-20: Operation of Gauges and hydrological Analysis at the Rivers „Wulbeck“ and „Wietze“ (Framework Contract). Unterhaltungsverband Nr. 46 „Wietze“.
2015-19: Operation of Gauges, Discharge Measurements and hydrological Analysis for the Water Works „Ahlhorn /Denghauser Mühlbach“ (Framework Contract). Agrarfrost GmbH & Co. KG.
2015-18: Operation of Gauges, Discharge Measurements and hydrological Analysis for the River „Hengstbeeke” (Framework Contract). City of Burgwedel.
2015-17: Echo Sounding Mining Pit „Immensen“ (Framework Contract). Gustav Lehmann Mörtel-, Sand- und Kieswerke GmbH.
2015-16: Monitoring Wietzen/Holte: Setup and Operation of Gauges and Measurement of Discharges (Framework Contract). Nienburger Geflügelspezialitäten, Zentral Office Oldenburger Geflügelspezialitäten GmbH & Co. KG (Wiesenhof).
2015-15: Operation of Gauges, Discharge Measurements, hydrological Analysis and Calculation of Infiltration/Exfiltration in Rivers for the Water Works „Burgdorfer Holz“ (Framework Contract). Wasserverband Peine.
2015-14: Operation of Gauges, Discharge Measurements and hydrological Analysis for several Creeks to calculate Water Balances for the Aquifer System of the Water Works “Holdorf” (Framework Contract). Oldenburgisch Ostfriesischer Wasserverband.
2015-13: Measurement of Water Levels, Discharges and River Cross Sections to setup and calibrate a Groundwater Model for the Aquifer System of the Water Works “Haren”. Trink- und Abwasserverband „Bourtanger Moor“
2015-12: Monitoring the Industrial Area „Große Schneede“: Operation of Gauges, Discharge Measurements and hydrological Analysis at „Ochsenmoorgraben“ (Framework Contract). Stadt Walsrode.
2015-11: Measurement of Water Levels, Discharges and River Cross Sections to setup and calibrate a Groundwater Model for the Aquifer System of the Water Works “Haselünne”. Trink- und Abwasserverband „Bourtanger Moor“
2015-09: Monitoring of Water Levels; Measurement of Discharges, hydrological Analysis and Calculation of Infiltration/Exfiltration to the Aquifer System of the Water Works “Thülsfelde” (Framework Contract). Oldenburgisch Ostfriesischer Wasserverband and WV Hümmling.
2015-08: Echo Sounding of the Mining Pit „Schliekum“. Hermann Wegener GmbH & Co. KG.
2015-07: Operation of Gauges, Measurement of Discharges and Conductivity and Calculation of Infiltration/Exfiltration to the Coastal Aquifer of the Water Works „Sandeler Möns“ (Framework Contract). Oldenburgisch Ostfriesischer Wasserverband.
2015-06: Operation of Gauges, Discharge Measurements and Calculation of Exfiltration/Infiltrations to Rivers in the Catchment of the Water Works „Düshorner Heide“ (Framework Contract). Wasserversorgungsverband Landkreis Fallingbostel.
2015-05: Monitoring of several Mining Pits at Steinwedel, Aligse and Röddensen (Framework Contract). ENGE Kies- und Recycling GmbH & Co. KG.
2015-04: Operation of Gauges, Discharge Measurements and hydrological Analysis at Creek „Ahlder Bach“ near Water Works „Ahlde” (Framework Contract). Trink- und Abwasserverband Bad Bentheim, Schüttdorf, Salzbergen, Emsbüren.
2015-03: Operation of Gauges, Discharge Measurements and Calculation of Water Balances for the Compensation Pools „Krickmeere/Forest Upjever“ near Schortens, „Wildenkiel/Forest Hochsolling“ near Neuhaus and „Grasgehege“ near Radbruch/Lüneburg“, Kleine Igelriede” near Barrage Thülsfelde and “Ahlhorner Lakes” near Ahlhorn (Framework Contract). Niedersächsische Landesforsten.
2015-02: Monitoring of Groundwater Levels; Water Quality and Echo Sounding of Mining Pits „Engensen”, “Kohlshorn”, “Ramlingen” and “Wackerwinkel” (Framework Contract). Löffler Sand- und Kieswerke GmbH.
2015-01: Longterm Monitoring of Water Levels at “Trunnenmoor” (Swamp) (Framework Contract). National Fond for Nature (NABU) – Office Burgwedel.
2014
2014-27: Operation of Gauges, Discharges Measurements, hydrological and statistical Analysis and Calculation of Infiltration/Exfiltration for Groundwater Aquifer “Fuhse/Wietze” (Framework Contract). Stadtwerke Hannover AG.
2014-26: Operation of Gauges, Discharge Measurements, hydrological and statistical Analysis for the Aquifer System of the Water Works “Adelheide” (Framework Contract). Stadtwerke Delmenhorst.
2014-25: Operation of Gauges and hydrological Analysis at the Rivers „Wulbeck“ and „Wietze“ (Framework Contract). Unterhaltungsverband Nr. 46 „Wietze“.
2014-24: Operation of Gauges, Discharge Measurements and hydrological Analysis for the Water Works „Ahlhorn /Denghauser Mühlbach“ (Framework Contract). Agrarfrost GmbH & Co. KG.
2014-23: Operation of Gauges, Discharge Measurements and hydrological Analysis for the River „Hengstbeeke” (Framework Contract). City of Burgwedel.
2014-22: Operation of Gauges, Discharge Measurements, hydrological Analysis and Calculation of Infiltration/Exfiltration in Rivers for the Water Works „Burgdorfer Holz“ (Framework Contract). Wasserverband Peine.
2014-21: Monitoring Wietzen/Holte: Setup and Operation of Gauges and Measurement of Discharges (Framework Contract). Nienburger Geflügelspezialitäten, Zentral Office Oldenburger Geflügelspezialitäten GmbH & Co. KG (Wiesenhof).
2014-20: Operational Monitoring and Integrated Operation of Pumping from the Groundwater System „Fuhse-Wietze“– Phase IX: Implementation of privileged Measures. Stadtwerke Hannover AG.
2014-19: Operation of Gauges, Discharge Measurements and hydrological Analysis for several Creeks to calculate Water Balances for the Aquifer System of the Water Works “Holdorf” (Framework Contract). Oldenburgisch Ostfriesischer Wasserverband.
2014-18: Measurement of Water Levels and Discharges in Rivers and Creeks to setup and calibrate a Groundwater Model for the Aquifer System of the Water Works “Haren”. Trink- und Abwasserverband „Bourtanger Moor“
2014-16: Monitoring Industrial Area „Große Schneede“: Operation of Gauges, Discharge Measurements and hydrological Analysis at „”Ochsenmoorgraben“ (Framework Contract). Stadt Walsrode.
2014-15: Measurement Campaigns in Dry and Rainy Season (Echo Sounding, Water Levels, Discharges by ADCP, Sediment Diameters) and Setup, Calibration and Operation of a 3D Sediment Transport Model (DELFT3D) to calculate Scour near Bridge Pears of the 2nd River Niger Bridge in Asaba-Onitsha/Nigeria –Phase II – „Incremental Concrete Launching Bridge“. Julius Berger International GmbH.
2014-14: Measurement of Water Levels and Discharges in Rivers and Creeks to Setup a Groundwater Model for the Aquifer System of the Water Works „Haselünne“. Trink- und Abwasserverband „Bourtanger Moor“
2014-13: Monitoring of Water Levels; Measurement of Discharges, hydrological Analysis and Calculation of Infiltration/Exfiltration to the Aquifer System of the Water Works “Thülsfelde” (Framework Contract). Oldenburgisch Ostfriesischer Wasserverband and WV Hümmling.
2014-12: Echo Sounding of the Mining Pit „Wietzesee“. Hermann Wegener GmbH & Co. KG.
2014-11: Federal Ministry of Education and Research: Project NAWAK: Measurement of Water Levels and Discharges to calculate Infiltration/Exfiltration to the Coastal Aquifer of the Water Works „Sandeler Möns“, Monitoring of Conductivity and Setup a Modeling Framework for the River System. Oldenburgisch Ostfriesischer Wasserverband.
2014-10: Measurement of Water Levels and Discharges to calculate Infiltration/Exfiltration for the Aquifer System of the Water Works „Walsrode”. Stadtwerke Böhmetal GmbH.
2014-09: Echo Sounding of the Mining Pit „Negenborn“. GP Günter Papenburg AG.
2014-07: Setup and Operation of Gauges, Discharge Measurements and Calculation of Exfiltration/Infiltrations to Rivers in the Catchment of the Water Works „Düshorner Heide“. Wasserversorgungsverband Landkreis Fallingbostel.
2014-06: Monitoring of several Mining Pits at Steinwedel, Aligse and Röddensen (Framework Contract). ENGE Kies- und Recycling GmbH & Co. KG.
2014-05: Operation of Gauges, Discharge Measurements and hydrological Analysis at Creek „Ahlder Bach“ near Water Works „Ahlde” (Framework Contract). Trink- und Abwasserverband Bad Bentheim, Schüttdorf, Salzbergen, Emsbüren.
2014-03: Operation of Gauges, Discharge Measurements and Calculation of Water Balances for the Compensation Pools „Krickmeere/Forest Upjever“ near Schortens, „Wildenkiel/Forest Hochsolling“ near Neuhaus and „Grasgehege“ near Radbruch/Lüneburg“ (Framework Contract). Niedersächsische Landesforsten.
2014-02: Monitoring of Groundwater Levels; Water Quality and Echo Sounding of Mining Pits „Engensen”, “Kohlshorn”, “Ramlingen” and “Wackerwinkel” (Framework Contract). Löffler Sand- und Kieswerke GmbH.
2014-01: Longterm Monitoring of Water Levels at “Trunnenmoor” (Swamp) (Framework Contract). National Fond for Nature (NABU) – Office Burgwedel.
2013
2013-13: Monitoring Wietzen/Holte: Setup and Operation of Gauges and Measurement of Discharges (Framework Contract). Nienburger Geflügelspezialitäten, Zentral Office of the Oldenburger Geflügelspezialitäten GmbH & Co. KG (Wiesenhof).
2013-10: Setup and Operation of Gauges and Measurement of Discharges at “Wildenkiel” near Neuhaus/Solling. Lower Saxony State Forests.
2013-09: Echo Sounding of a Mining near Immensen. Gustav Lehmann Mörtel-, Sand- und Kieswerke GmbH.
2013-08: Monitoring of several Minings at Steinwedel, Aligse and Röddensen (Framework Contract). ENGE Kies- und Recycling GmbH & Co. KG.
2013-07: Setup and Operation of Gauges, Measurement of Discharges and Calculation of Discharges for a Water Balance at „Grasgehege“ near Radbruch/Lüneburg. Lower Saxony State Forests.
2013-05: Setup and Operation of Gauges, Measurement of Discharges and Calculation of a Water Balance for „Krickmeere“ at Forest Upjever near Schortens. Lower Saxony State Forests.
2013-04: ADCP Measurements at three pre-evaluated Sites for an In-Stream River Turbine at the River Nile / Uganda downstream Haven Falls. KSB AG.
2013-03: Setup and Operation of Gauges and Evaluation of different Variants for a Revitalization of „Kreuzholzmoor” near Rehburg-Loccum. Lower Saxony State Forests.
2012
2012-09: Setup and Operation of Gauges, Measurement and Calculation of Discharges at „Grasgehege”. Lower Saxony State Forests.
2012-08: Echo Sounding of several Lakes in Steinwedel and Aligs. ENGE Kies & Recycling GmbH & Co. KG
2012-07: Setup and Operation of Gauges, Measurement and Calculation of Discharges at „Großes Holz”. Lower Saxony State Forests.
2012-06: ADCP Measurements at potential Sites for an In-Stream River Turbine at the River Nile / Uganda downstream Jinja near Haven Falls. Deutsche Gesellschaft für Internationale Zusammenarbeit (GIZ) GmbH.PDF
2012-03: Development, Setup and Operation of a Offshore Platform to measure Wave Heights, Tidal Water Levels and climate Data near Borkum. Patzold, Köbke und Partner Engineers / EWE AG.PDF
2012-01: Setup and Operation of 2 Gauges at Deelschlot (Framework Contract). Oldenburgisch-Ostfriesischer Wasserverband and Wasserverband Hümmling.
2011
2011-11: Setup, Operation and Statistical Analysis of 3 Gages – WW Nethen (Framework Contract). Oldenburgisch Ostfriesischer Wasserverband.
2011-10: Setup, Operation and Statistical Analysis of 3 Gages – WW Burgdorfer Holz (Framework Contract). Wasserverband Peine.
2011-09: Discharge Measurements at Ems-Jade-Canal. Niedersachsen Wasser Kooperations- und Dienstleistungsgesellschaft mbH.
2011-08: Monitoring of Water Levels at the River Hengstbeeke (Framework Contract). City of Burgwedel.
2011-06: Setup and Operation of 2 Gauges at Denghauser Mühlbach (Framework Contract). Agrarfrost GmbH & Co. KG.
2011-04: Setup and Operation of 2 Gauges at Wulbeck and Wietze (Framework Contract). Unterhaltungsverband Nr. 46 „Wietze“.
2011-03: Monitoring of Currents in the Entrance of Amerikahafen using a horizontal ADCP moving over the water depth. Ports of Lower Saxony GmbH & Co KG.PDF
2011-02: Monitoring of Water Levels at Dünsener Bach (Framework Contract). Stadtwerke Delmenhorst.
2011-01: ADCP-measurements near Offshore-Berth 1 at CT1 / RWE Baustelle – Bremerhaven. Sterk Spezialtiefbau GmbH.
2010
2010-13: Longterm Monitoring of Water Levels at “Trunnenmoor” (Swamp). National Fond for Nature (NABU) – Office Burgwedel.
2010-09: ADCP-measurements at “Amerikahafen” and in the Entrance of ”Fischereihafen” to improve Maintenance Dredging by Water Injection. Ports of Lower Saxony GmbH & Co KG.PDF
2010-06: Setup, Operation and Statistical Analysis of Groundwater Gauges. Stadtwerke Delmenhorst GmbH.
2010-04: Setup, Operation and Statistical Analysis of 5 Gauges at River Hengstbeeke. Stadt Burgwedel.
2009
2009-05: ADCP-Measurements and Site Inspection for River Turbines in the River Rhine. KSB AG.PDF
2009-03: ADCP-Measurements, Water Level Measurements and Echo Soundings at Hydro Electric Power Plants Inga I + II / Democratic Republic of Kongo. Fichtner GmbH & Co. KG. PDF
2008
2008-12: Measurement of Water Levels and Discharges (11 Locations) in the Wietze Catchment. Stadtwerke Hannover AG.
2008-10: Design of a dynamic Mooring System for Waves induced by passing POSTPANMAX Ships for Berth K1 at Stade-Bützfleth. Electrabel Deutschland AG.
2008-06: Waves and Currents in the Entrance of the Offshore Basis Hafen Cuxhaven during the Passage of fast going Ships (POSTPANMAX Ships and Bulk Carrier). Ports of Lower Saxony GmbH & Co. KG.
2008-06: Waves and Currents in the Entrance of the Offshore Basis Hafen Cuxhaven during the Passage of fast going Ships (POSTPANMAX Ships and Bulk Carrier). Ports of Lower Saxony GmbH & Co. KG. PDF
2007
2007-02: Two-Frequency Echo Sounding of the Lake „Steinhuder Meer“. GLL Hannover – Domänenamt Hannover. PDF
2006
2006-10: Measurement of Embankments and Bathymetry of the River Wörpe between Heidberger Straße and Grasberg. WBV Teufelsmoor.
2006-09: Echo Sounding of the River Leine at Culverts Letter, Marienwerder and Lohnde and Simulation of Bed Stability. Stadtentwässerung Hannover.
2006-06: Measurement of Topography and Bathymetry at Hengstbeeke and Rixförder Graben. Enercity AG.
2006-04: Measurement of Water Levels at NNQ for the Catchment of the River Wietze. Stadtwerke Hannover AG.
2006-03: Measurement of Topography and Bathymetry in the Inland Delta of the River Wümme. Unterhaltungsverband Untere Wümme.
2005
2005-06: Echo Sounding the digging „BAB-Abfahrt Braunschweig Hafen“ and Calculation of rest-volume. August Kahlfeldt & Co..
2005-01: 2-Frequence Echo Sounding of the River Hamme / 22 km. Wasser- und Bodenverband Teufelsmoor.