Nature & Water Resource Management

Climate Change

2014-11: BMBF-Project NAWAK: Development of sustainable Adaption Strategies

2008-04: Regional Management of Climate Change in the Metropolregion Hannover-Braunschweig-Göttingen

Discharge of Clear Water

2008-13: Spreading of cleaned Waste Water in the Hamme-Lesum Estuary near Ritterhude

Discharge of Cooling Water

2016-26: Untersuchungen zur Kühlwasserrückkopplung des geplanten Kraftwerksblockes “Song Hau 1″ im Mekong Delta bei Can Tho, Vietnam

2007-01: Mixing and Distribution of Cooling Water in the River Elbe and River Schwinge near Power Plant “Stadersand”

2008-01: Mixing and Temperature Distribution of Cooling Water at the Outlet of the Power Plant Dörpen / Ems River

Groundwater Management

2014-11: BMBF-Project NAWAK: Development of sustainable Adaption Strategies

2014-03: Flow measurement and determination of water balances for the „Krickmeere“, the „Wildenkiel“ and the „Grasgehege“

2006-07, 2007-06, 2008-03, 2009-12, 2010-08, 2011-05, 2012-04: Operational Monitoring and Integrated Operation of Pumping from the Groundwater System „Fuhse-Wietze“ (Phase I – VII)

Renaturation

2017-29: Compensation pool „Ahäuser Zuschlag“: Conversion of a stepped bottom ramp made of concrete box profiles into a continuous flat bed glide with gravel fill at the Puchgraben, Niedersächsische Landesforsten

 

Projects

2017

2017-34: Water law procedure, Liebenau II, development of the compensation concept in the area of the “Speelsmoor”, Harzwasserwerke GmbH

2017-33: Drilling mud pit Siedenburg II – Preliminary risk assessment, supplementary measurements of water level, discharge and conductivity, Arcadis Germany GmbH

2017-29: Compensation pool „Ahäuser Zuschlag“: Conversion of a stepped bottom ramp made of concrete box profiles into a continuous flat bed glide with gravel fill at the Puchgraben, Niedersächsische Landesforsten, Forstamt Ankum

2017-26: Song Hau Power Plant, Block 1 – Simulation of 3D Fluid Dynamics and Temperature Distribution at Intake/Outfall, measurements to establish boundary conditions, sounding of the riverbed and numerical modelling with Delft3D Flexible Mesh. Envi Con & Plant Engineering GmbH.

2017-22: Setup of Gauges at Ahlhorner Lakes (Water Works „Großenkneten“). Oldenburgisch Ostfriesischer Wasserverband.

2017-21: Numerical simulation of the dispersion of pollutants in the Lac de la Haute Sure reservoir using a three-dimensional hydronumeric mass transport model (phase II), Syndicat des Eaux du Barrage d’Esch sur Sure, Luxemburg

2017-19: Water law procedure „Fuhrberger Feld“: Longterm Simulation of Water Levels and Discharges for the River System of the “Fuhse-Wietze-Wulbeck-Basin” in a coupled Groundwater-Surface-Water Model (Framework Contract). Stadtwerke Hannover AG.

2017-17: Operation of Gauges, Discharges Measurements, hydrological and statistical Analysis and Calculation of Infiltration/Exfiltration for Groundwater Aquifer “Fuhse/Wietze” (Framework Contract). Stadtwerke Hannover AG.

2017-11: Monitoring Wietzen/Holte: Setup and Operation of Gauges and Measurement of Discharges and Water Quality (Framework Contract). Nienburger Geflügelspezialitäten, Zentral Office Oldenburger Geflügelspezialitäten GmbH & Co. KG (Wiesenhof)

2017-07: Operation of Gauges, Discharge Measurements, Monitoring of Conductivity and Calculation of Infiltration/Exfiltration to Rivers and Creeks of the Coastal Aquifer System of the Water Works „Sandeler Möns“ (Framework Contract). Oldenburgisch Ostfriesischer Wasserverband.

2017-03: Operation of Gauges, Discharge Measurements and hydrological Analysis at Creek „Ahlder Bach“ near Water Works „Ahlde” (Framework Contract). Trink- und Abwasserverband Bad Bentheim, Schüttdorf, Salzbergen, Emsbüren.

2017-02: Operation of Gauges, Discharge Measurements and Calculation of Water Balances for the Compensation Pools „Krickmeere/Forest Upjever“ near Schortens, „Wildenkiel/Forest Hochsolling“ near Neuhaus and „Grasgehege“ near Radbruch/Lüneburg“, Kleine Igelriede” near Barrage Thülsfelde and “Ahlhorner Lakes” near Ahlhorn (Framework Contract). Niedersächsische Landesforsten.

2016

2016-31: Determination of the scientific background of the available water resources for the water law procedure for the Water Works Graft, Delmenhorst (Framework Contract). Stadtwerke Delmenhorst GmbH.

2016-30: 3D-flow measurements (ADCP) during a flood event ant the upper River Rhine between Constance-DE und Basel-CH. SEBA Hydrometrie GmbH & Co. KG.

2016-26: Song Hau Power Plant, Block 1 – Simulation of 3D Fluid Dynamics and Temperature Distribution at Intake/Outfall, measurements to establish boundary conditions, sounding of the riverbed and numerical modelling with Delft3D Flexible Mesh. Envi Con & Plant Engineering GmbH.

2016-24: Extension of the Wind Farm „Karstädt-Blüthen-Premslin“: Design of a Crane Habitat near Strehlen (Compensation Measure). Windplan Blüthen-Waterloo GmbH & Co. KG.

2016-23: Setup of Gauges at Ahlhorner Lakes (Water Works „Großenkneten“). Oldenburgisch Ostfriesischer Wasserverband.

2016-22: Echo Sounding, Measurement of Water Levels, ADCP Current Measurements and Setup a Water Balance for the Barrage „Lac de la Haute Sure“. Syndicat des Eaux du Barrage d’Esch sur Sure, Luxemburg.

2016-20: Water law procedure „Fuhrberger Feld“: Longterm Simulation of Water Levels and Discharges for the River System of the “Fuhse-Wietze-Wulbeck-Basin” in a coupled Groundwater-Surface-Water Model (Framework Contract). Stadtwerke Hannover AG.

2016-18: Operation of Gauges, Discharges Measurements, hydrological and statistical Analysis and Calculation of Infiltration/Exfiltration for Groundwater Aquifer “Fuhse/Wietze” (Framework Contract). Stadtwerke Hannover AG.

2016-12: Monitoring Wietzen/Holte: Setup and Operation of Gauges and Measurement of Discharges (Framework Contract). Nienburger Geflügelspezialitäten, Zentral Office Oldenburger Geflügelspezialitäten GmbH & Co. KG (Wiesenhof).

2016-08: Operation of Gauges, Discharge Measurements, Monitoring of Conductivity and Calculation of Infiltration/Exfiltration to Rivers and Creeks of the Coastal Aquifer System of the Water Works „Sandeler Möns“ (Framework Contract). Oldenburgisch Ostfriesischer Wasserverband.

2016-04: Operation of Gauges, Discharge Measurements and hydrological Analysis at Creek „Ahlder Bach“ near Water Works „Ahlde” (Framework Contract). Trink- und Abwasserverband Bad Bentheim, Schüttdorf, Salzbergen, Emsbüren.

2016-03: Operation of Gauges, Discharge Measurements and Calculation of Water Balances for the Compensation Pools „Krickmeere/Forest Upjever“ near Schortens, „Wildenkiel/Forest Hochsolling“ near Neuhaus and „Grasgehege“ near Radbruch/Lüneburg“, Kleine Igelriede” near Barrage Thülsfelde and “Ahlhorner Lakes” near Ahlhorn (Framework Contract). Niedersächsische Landesforsten.

2015

2015-25: Water law procedure „Fuhrberger Feld“: Longterm Simulation of Water Levels and Discharges for the River System of the “Fuhse-Wietze-Wulbeck-Basin” in a coupled Groundwater-Surface-Water Model (Framework Contract). Stadtwerke Hannover AG.

2015-24: Water law procedure „Burgdorfer Holz“: Additional hydrological Investigations for the River „Seebeeke“ to optimize Groundwater Management and available Water Resources. Wasserverband Peine.

2015-16: Monitoring Wietzen/Holte: Setup and Operation of Gauges and Measurement of Discharges (Framework Contract). Nienburger Geflügelspezialitäten, Zentral Office Oldenburger Geflügelspezialitäten GmbH & Co. KG (Wiesenhof).

2015-11: Measurement of Water Levels, Discharges and River Cross Sections to setup and calibrate a Groundwater Model for the Aquifer System of the Water Works “Haselünne”. Trink- und Abwasserverband „Bourtanger Moor“

2015-10: Extension of the Wind Farm „Karstädt-Blüthen-Premslin“: Design of a Crane Habitat near Strehlen (Compensation Measure). Windplan Blüthen-Waterloo GmbH & Co. KG.

2015-07: Operation of Gauges, Measurement of Discharges and Conductivity and Calculation of  Infiltration/Exfiltration to the Coastal Aquifer of the Water Works „Sandeler Möns“ (Framework Contract). Oldenburgisch Ostfriesischer Wasserverband.

2015-03: Operation of Gauges, Discharge Measurements and Calculation of Water Balances for the Compensation Pools „Krickmeere/Forest Upjever“ near Schortens, „Wildenkiel/Forest Hochsolling“ near Neuhaus and „Grasgehege“ near Radbruch/Lüneburg“, Kleine Igelriede” near Barrage Thülsfelde and “Ahlhorner Lakes” near Ahlhorn (Framework Contract). Niedersächsische Landesforsten.

2014

2014-24: Operation of Gauges, Discharge Measurements and hydrological Analysis for the Water Works „Ahlhorn /Denghauser Mühlbach“ (Framework Contract). Agrarfrost GmbH & Co. KG.

2014-18: Measurement of Water Levels and Discharges in Rivers and Creeks to setup and calibrate a Groundwater Model for the Aquifer System of the Water Works “Haren”. Trink- und Abwasserverband „Bourtanger Moor“

2014-16: Monitoring Industrial Area „Große Schneede“: Operation of Gauges, Discharge Measurements and hydrological Analysis at „”Ochsenmoorgraben“ (Framework Contract). Stadt Walsrode.

2014-14: Measurement of Water Levels and Discharges in Rivers and Creeks to Setup a Groundwater Model for the Aquifer System of the Water Works „Haselünne“. Trink- und Abwasserverband „Bourtanger Moor“

2014-11: Federal Ministry of Education and Research: Project NAWAK: Measurement of Water Levels and Discharges to calculate Infiltration/Exfiltration to the Coastal Aquifer of the Water Works „Sandeler Möns“, Monitoring of Conductivity and Setup a Modeling Framework for the River System. Oldenburgisch Ostfriesischer Wasserverband.

2014-04: Calculation of Mass Balances for the Feasibility Study „Re-Connection of the Wrauster Meander to the River Elbe”. Stiftung Lebensraum Elbe e.V.

2014-03: Operation of Gauges, Discharge Measurements and Calculation of Water Balances for the Compensation Pools „Krickmeere/Forest Upjever“ near Schortens, „Wildenkiel/Forest Hochsolling“ near Neuhaus and „Grasgehege“ near Radbruch/Lüneburg“ (Framework Contract). Niedersächsische Landesforsten.

2013

2013-11: Operational Monitoring and Integrated Operation of Pumping from the Groundwater System „Fuhse-Wietze“– Phase VIII: Implementation of privileged Measures. Stadtwerke Hannover AG.PDF

2013-04: ADCP Measurements at three pre-evaluated Sites for an In-Stream River Turbine at the River Nile / Uganda downstream Haven Falls. KSB AG.

2013-02: Feasibility Study for the Revitalization of Wrauster Bogen at the River Elbe downstream Geesthacht – Setup of a hydrodynamic 3D Model and Optimization of different Alternatives. Stiftung Lebensraum Elbe e.V..

2013-01: Compensation Pool „Nienburger Bruch“: Feasibility Study for a Revitalization of „Bärenfallgraben“. Lower Saxony State Forests.

2012

2012-04: Operational Monitoring and Integrated Operation of Pumping from the Groundwater System „Fuhse-Wietze“– Phase VII: Implementation of privileged Measures. Stadtwerke Hannover AG.PDF

2012-02: Evaluation of potential Sites for an In-Stream River Turbine at the River Nile / Uganda downstream Jinja near Haven Falls. Deutsche Gesellschaft für Internationale Zusammenarbeit (GIZ) GmbH.

2011

2011-05: Operational Monitoring and Integrated Operation of Pumping from the Groundwater System „Fuhse-Wietze“– Phase VI: Implementation of privileged Measures. Stadtwerke Hannover AG.PDF

2010

2010-14: Variation of Water Levels after Revitalization of River Banks at the River Eiter between Holschenböhl and L331. Mittelweserverband.

2010-12: Transport and Drift of Fish Spawn in the River Elbe. DOW Deutschland Anlagengesellschaft mbH und E.ON Kraftwerke GmbH.PDF

2010-10: Wetland “Michelsweg” near Nienhagen. Ingenieurbüro Baarck.

2010-08: Operational Monitoring and Integrated Operation of Pumping from the Groundwater System „Fuhse-Wietze“– Phase V: Implementation of privileged Measures. Enercity AG.PDF

2010-05: Industrial Power Plant of DOW Deutschland Anlagengesellschaft mbH at Stade/Bützfleth – Hydrodynamic Effects and Impact on Sediment Transport – „Raumordnungsverfahren“. DOW Deutschland Anlagengesellschaft mbH.

2009

2009-12: Operational Monitoring and Integrated Operation of Pumping from the Groundwater System „Fuhse-Wietze“– Phase IV: Implementation of privileged Measures. Enercity AG.PDF

2009-09: Agricultural Council of Lower Saxony.

2009-02: Variation of Water Levels in the River Hengstbeeke after Extension of Sewage Plant Burgwedel. City of Burgwedel.

2008

2008-13: Spreading of cleaned Waste Water in the Hamme-Lesum Estuary near Ritterhude. Public Services Osterholz-Scharmbeck GmbH. PDF

2008-09: Masterplan „River Wietze“. Unterhaltungsverbandes Nr. 46 „Wietze“.

2008-08: Redirection of Waste Water Treatment Plants Engensen, Thönse, Wettmar to the Waste Water Treatment Plant Burgwedel – Influences on Water Levels of Hengstbeeke, Wulbeck and Burgwedel – Masterplan “Waste Water Treatment Burgwedel”. City of Burgwedel.

2008-05: : Influence of a Redirection of Discharges from the Waste Water Treatment Plant Wettmar on Water Levels in Trunnenmoor. City of Burgwedel.

2008-04: Regional Management of Climate Change in the Metropolregion Hannover-Braunschweig-Göttingen. Enercity AG and German Ministry of Education and Research.PDF

2008-03: Operational Monitoring and Integrated Operation of Pumping from the Groundwater System „Fuhse-Wietze“– Phase III: Implementation of privileged Measures. Wasserverband Peine.PDF

2008-01: Mixing and Temperature Distribution of Cooling Water at the Outlet of the Power Plant Dörpen / Ems River. BKW FMB Energie AG/Bern and ENBW AG/Stuttgart. PDF

2007

2007-06: Operational Monitoring and Integrated Operation of Pumping from the Groundwater System „Fuhse-Wietze“ – Phase II: Transient Simulation of Measures. Wasserverband Peine.PDF

2007-01: Mixing and Distribution of Cooling Water in the River Elbe and River Schwinge near Power Plant Stadersand. E.ON Kraftwerke GmbH.PDF

2006

2006-07: : Operational Monitoring and Integrated Operation of Pumping from the Groundwater System „Fuhse-Wietze“– Phase I: Development of Measures. Wasserverband Peine.PDF

2006-05: Revitalization and Dewatering River Banks of the River Wietze near Langenhagen – Simulation of Water Levels and Monitoring of Surface Water Levels, Discharges and Groundwater Levels. Stadt Langenhagen.

2006-02: Discharge Capacity of the Outlet System at Purification Plant „Thönse”. City of Burgwedel.

2005

2005-04: Intensity and Distribution of Rainfall at Flaesheim/Arenbergstraße / 02.05.1998. Landesbetrieb Straßenbau Nordrhein-Westfalen.

2005-02: Protection of National Parks (GR-Gebiet) „Hammeniederung“ – Implementation of Measures for Biodiversity – „Breites Wasser“ and „Altarme“. County of Osterholz-Scharmbeck.

2000

2000-01: Influence of Sand and Gravel Exploration on Floods in the River Leine near Schlickum – Schulenberg. Ingenieurbüro Dr.-Ing V. Patzold.